The construction project involves the construction of three new 7-storey (partly 5-storey) building sections, which will be built on a common basement as a terp floor.
As an engineering office for structural engineering, gbc engineers is responsible for the preparation of the formwork and reinforcement plans, as well as the position plan of the foundation.
The building parts are considered statically independent of each other. The roof is planned as a flat roof in reinforced concrete, with an optional inverted roof and greenery.
The floor slabs are also planned in reinforced concrete, load-bearing interior and exterior walls are mainly made of masonry.