Sengelmannstrasse

Want to discuss more about this service?
Get in touch
Project Description

The building project involves the construction of a new sprinkler control center and two single-story halls (H3 and H4) with covered outdoor storage for production and logistics directly adjacent to an existing hall (H1). Hall H3 is separated from halls H1 and H4 by movement joints in the roof level. The individual partial buildings have the following dimensions:

- Hall 3: 197,91 m x 35,00 m x 10,00 m
- Hall 4: 75,6 m x 40,7 m x 10,00 m
- Sprinkler control center: 9,70 m x 9,70 m x 3,50 m

Location
St. Egidien, Germany
Project Scale
Two production halls and a sprinkler control center
 
GFA
Approx. 11,800 sqm
Design
2022 – 2023 (Realization: 2024)

Other Projects

Project Reference
Strausberg, Germany
Wentorf near Hamburg, Germany

Tell us more about your bespoke requirements

Speak to a leading expert in your sector and arrange a detailed consultation about your project.