The building project involves the construction of a new sprinkler control center and two single-story halls (H3 and H4) with covered outdoor storage for production and logistics directly adjacent to an existing hall (H1). Hall H3 is separated from halls H1 and H4 by movement joints in the roof level. The individual partial buildings have the following dimensions: